Soil & compost
- Volume = total area × depth.

Garden calculator
Key fact: Net volume: 2 m³ (Material: Soil; Length: 5 m; Width: 4 m; Fill depth: 10 cm; Additional loose fill: 10 %; …). Worked example from this calculator's default values, updated 26 November 2026.
How much soil fills a raised bed? Multiply its internal length by width by fill depth. A 4 × 8 ft bed filled 1 ft deep needs 32 ft³, about 0.906 m³ or 906.1 L, before any allowance.
The worked example gives 2 m³ (Net volume).
Covering 5 × 4 m at 10 cm deep needs 2 m³ of soil. With a 10% allowance for settling that is 2.2 m³ (2,200 L, about 77.7 ft³), which is exactly 55 bags of 40 L.
Amazon
Every calculation option
Add each material layer separately; existing fill and solid objects reduce the depth you need to fill.
Use the supplier’s bulk density and choose bag or bulk delivery quantities.
| Input | Value |
|---|---|
| Material | Soil |
| Measured sections | Length 5 m, Width 4 m |
| Fill depth | 10 cm |
| Additional loose fill | 10 % |
| Pack size | 40 L |
| Result | Value |
|---|---|
| Net volume | 2 m³ |
| Loose volume | 2.2 m³ |
| Loose volume in cubic feet | 77.692 ft³ |
| Required quantity | 2,200 L |
| Packs to buy | 55 |
| Purchase quantity | 2,200 L |
| Left over | 0 L |
With Material: Soil; Length: 5 m; Width: 4 m; Fill depth: 10 cm; Additional loose fill: 10 %; Pack size: 40 L, the calculator returns Net volume: 2 m³.
| Inputs | Changed input |
|---|---|
| Material | Soil |
| Length | 5 m |
| Width | 4 m |
| Fill depth | 10 cm |
| Additional loose fill | 10 % |
| Pack size | 40 L |
| Calculated result | Changed input |
|---|---|
| Net volume | 2 m³ |
| Loose volume | 2.2 m³ |
| Loose volume in cubic feet | 77.692 ft³ |
| Required quantity | 2200 L |
| Packs to buy | 55 |
| Purchase quantity | 2200 L |
| Left over | 0 L |
Volume = total area × depth.
The reference cases change only Fill depth. The remaining inputs stay at the displayed values. These are worked scenarios, not universal rates, dimensions, product specifications or current shop prices.
| Fill depth | Net volume |
|---|---|
| Fill depth: 10 cm | Net volume: 2 m³ |
| Fill depth: 3 cm | Net volume: 0.6 m³ |
| Fill depth: 5 cm | Net volume: 1 m³ |
| Fill depth: 15 cm | Net volume: 3 m³ |
| Fill depth: 20 cm | Net volume: 4 m³ |
Volume = total area × depth. In the displayed example, Material: Soil; Length: 5 m; Width: 4 m; Fill depth: 10 cm; Additional loose fill: 10 %; Pack size: 40 L. The calculated outputs are Net volume: 2 m³; Loose volume: 2.2 m³; Loose volume in cubic feet: 77.692 ft³; Required quantity: 2200 L. Keep the labels and units with these numbers: they describe this particular combination of inputs, not a result that can be reused after the measurements or assumptions change.
The table isolates that input while keeping the other displayed settings fixed. For Fill depth: 3 cm, the result is Net volume: 0.6 m³; for Fill depth: 20 cm, it is Net volume: 4 m³. Those values come from the same calculator used on this page. They show the effect of changing the input, rather than prescribing which input is right for your own task.
Read each named quantity separately: Net volume: 2 m³; Loose volume: 2.2 m³; Loose volume in cubic feet: 77.692 ft³; Required quantity: 2200 L. A value with a different label or unit answers a different part of the calculation. Check the measurements and assumptions before using any figure. The reference cases explain the arithmetic under their stated conditions; they do not verify a product label, a recipe or the conditions of a particular project.
One cubic metre is 1,000 litres. A bed measuring 2 × 1 × 0.3 m requires 0.6 m³, or 600 L, before allowance or existing material. The tool calculates volume; bag weight varies with the material and moisture and is not a reliable substitute for labelled litres.
Subtract usable existing material where the chosen mode allows it. Consider the desired finished level and whether the product settles, but enter any settling allowance explicitly. The calculator does not prescribe a suitable soil mixture for a particular plant or drainage problem.
Divide the required litres by the litres stated on each bag and round up to whole bags. A calculated 600 L fill therefore needs fifteen 40 L bags before any separately entered allowance. Check whether existing soil occupies part of the measured space; the full geometric volume need not all be new material.
Calculation/content reviewed 4 October 2026. Source: Babushka Market’s displayed formulas, units and labelled editable assumptions. How the estimates work
These are dimension examples, not recommended bed depths. Measure inside the frame and subtract any layers or objects that displace soil. The 40 L bag column is a user-selectable pack-size example already used by this calculator; it assumes zero extra allowance.
| Inside dimensions | Volume ft³ | Volume m³ | Litres | 40 L bags |
|---|---|---|---|---|
| 4 × 4 × 1 ft | 16 ft³ | 0.453 m³ | 453.1 L | 12 |
| 4 × 8 × 1 ft | 32 ft³ | 0.906 m³ | 906.1 L | 23 |
| 3 × 6 × 1 ft | 18 ft³ | 0.510 m³ | 509.7 L | 13 |
| 1 × 1 × 0.3 m | — | 0.300 m³ | 300 L | 8 |
| 2 × 1 × 0.3 m | — | 0.600 m³ | 600 L | 15 |
Volume = length × width × depth. One cubic foot is 28.32 L; 1 m³ is 1,000 L. The calculator’s raised-bed layers mode separates layers before summing them. Plan the materials using the raised-bed filling guide and check the soil-depth guide before entering your own depth.
No. The table shows the measured void and zero allowance. Enter any additional loose fill once in the calculator, based on your material and supplier guidance.