Babushka Market

Home & DIY calculator

Concrete Slab Calculator

Key fact: Volume before allowance: 2 m³ (Length: 5 m; Width: 4 m; Depth: 10 cm; Extra allowance: 10 %; Yield per bag: 12 L). Worked example from this calculator's default values, updated 26 November 2026.

Slab

Calculate a rectangular slab from its finished dimensions.

Method and practical checks

  • Volume = length × width × depth. Bag yield is cured volume from the product label, not bag mass. This is quantity planning, not structural design.

Your measurements and assumptions

Use the actual product label and your measured quantities. Starting values are editable examples, not universal rates or product specifications. Keep the units beside each input.

Example with the selected inputs
Length5m
Width4m
Depth10cm
Extra allowance10%
Yield per bag12L

Method and assumptions

Volume = length × width × depth. This is quantity planning, not structural design.

Cylinder volume = π × radius² × height × count. Structural dimensions must come from a suitable design.

Apply the allowance once. Round bags up only after converting the final required volume to litres.

Example with the selected inputs

Change the inputs to match your own task. Whole packages are rounded up after allowances, so purchase quantity and actual requirement can differ. Apply each allowance once.

Worked example

With Length: 5 m; Width: 4 m; Depth: 10 cm; Extra allowance: 10 %; Yield per bag: 12 L, the calculator returns Volume before allowance: 2 m³.

Inputs
InputsChanged input
Length5 m
Width4 m
Depth10 cm
Extra allowance10 %
Yield per bag12 L
Calculated result
Calculated resultChanged input
Volume before allowance2 m³
Concrete volume2.2 m³
Required quantity2200 L
Packs to buy184
Purchase quantity2208 L
Left over8 L

Method and assumptions

Volume = length × width × depth. This is quantity planning, not structural design.

Common-value reference

The reference cases change only Length. The remaining inputs stay at the displayed values. These are worked scenarios, not universal rates, dimensions, product specifications or current shop prices.

Common-value reference
LengthVolume before allowance
Length: 5 mVolume before allowance: 2 m³
Length: 2.5 mVolume before allowance: 1 m³
Length: 7.5 mVolume before allowance: 3 m³
Length: 10 mVolume before allowance: 4 m³
Length: 15 mVolume before allowance: 6 m³

Questions and answers

How is this example calculated?

Volume = length × width × depth. This is quantity planning, not structural design. In the displayed example, Length: 5 m; Width: 4 m; Depth: 10 cm; Extra allowance: 10 %; Yield per bag: 12 L. The calculated outputs are Volume before allowance: 2 m³; Concrete volume: 2.2 m³; Required quantity: 2200 L; Packs to buy: 184. Keep the labels and units with these numbers: they describe this particular combination of inputs, not a result that can be reused after the measurements or assumptions change.

What changes when I edit Length?

The table isolates that input while keeping the other displayed settings fixed. For Length: 2.5 m, the result is Volume before allowance: 1 m³; for Length: 15 m, it is Volume before allowance: 6 m³. Those values come from the same calculator used on this page. They show the effect of changing the input, rather than prescribing which input is right for your own task.

How should I use the different result figures?

Read each named quantity separately: Volume before allowance: 2 m³; Concrete volume: 2.2 m³; Required quantity: 2200 L; Packs to buy: 184. A value with a different label or unit answers a different part of the calculation. Check the measurements and assumptions before using any figure. The reference cases explain the arithmetic under their stated conditions; they do not verify a product label, a recipe or the conditions of a particular project.