Key fact: Volume before allowance: 2 m³ (Length: 5 m; Width: 4 m; Depth: 10 cm; Extra allowance: 10 %; Yield per bag: 12 L). Worked example from this calculator's default values, updated 26 November 2026.

What does a worked calculation look like?

A 5 × 4 m slab at 10 cm deep holds 2 m³ of concrete, or 2.2 m³ with a 10% allowance. That is 2,200 L; bags that yield 12 L each mean 184 bags. At this size, ready-mixed delivery is usually more practical than bags.

Slab

Calculate a rectangular slab from its finished dimensions.

Method and practical checks

  • Volume = length × width × depth. Bag yield is cured volume from the product label, not bag mass. This is quantity planning, not structural design.

How the Concrete Calculator works

Every calculation option

Slab

  • Volume = length × width × depth. This is quantity planning, not structural design.

Round volume

Use for cylindrical quantities with a measured diameter.

  • Cylinder volume = π × radius² × height × count. Structural dimensions must come from a suitable design.

Known volume to bags

Enter a volume from another measurement or supplier estimate.

  • Apply the allowance once. Round bags up only after converting the final required volume to litres.

Worked example

Pre-filled values: Slab
InputValue
Length5 m
Width4 m
Depth10 cm
Extra allowance10 %
Yield per bag12 L
Calculated result
ResultValue
Volume before allowance2 m³
Concrete volume2.2 m³
Required quantity2,200 L
Packs to buy184
Purchase quantity2,208 L
Left over8 L

Reading the result

Worked example

With Length: 5 m; Width: 4 m; Depth: 10 cm; Extra allowance: 10 %; Yield per bag: 12 L, the calculator returns Volume before allowance: 2 m³.

Inputs
InputsChanged input
Length5 m
Width4 m
Depth10 cm
Extra allowance10 %
Yield per bag12 L
Calculated result
Calculated resultChanged input
Volume before allowance2 m³
Concrete volume2.2 m³
Required quantity2200 L
Packs to buy184
Purchase quantity2208 L
Left over8 L

Method and assumptions

Volume = length × width × depth. This is quantity planning, not structural design.

Common-value reference

The reference cases change only Length. The remaining inputs stay at the displayed values. These are worked scenarios, not universal rates, dimensions, product specifications or current shop prices.

Common-value reference
LengthVolume before allowance
Length: 5 mVolume before allowance: 2 m³
Length: 2.5 mVolume before allowance: 1 m³
Length: 7.5 mVolume before allowance: 3 m³
Length: 10 mVolume before allowance: 4 m³
Length: 15 mVolume before allowance: 6 m³

Questions and answers

How is this example calculated?

Volume = length × width × depth. This is quantity planning, not structural design. In the displayed example, Length: 5 m; Width: 4 m; Depth: 10 cm; Extra allowance: 10 %; Yield per bag: 12 L. The calculated outputs are Volume before allowance: 2 m³; Concrete volume: 2.2 m³; Required quantity: 2200 L; Packs to buy: 184. Keep the labels and units with these numbers: they describe this particular combination of inputs, not a result that can be reused after the measurements or assumptions change.

What changes when I edit Length?

The table isolates that input while keeping the other displayed settings fixed. For Length: 2.5 m, the result is Volume before allowance: 1 m³; for Length: 15 m, it is Volume before allowance: 6 m³. Those values come from the same calculator used on this page. They show the effect of changing the input, rather than prescribing which input is right for your own task.

How should I use the different result figures?

Read each named quantity separately: Volume before allowance: 2 m³; Concrete volume: 2.2 m³; Required quantity: 2200 L; Packs to buy: 184. A value with a different label or unit answers a different part of the calculation. Check the measurements and assumptions before using any figure. The reference cases explain the arithmetic under their stated conditions; they do not verify a product label, a recipe or the conditions of a particular project.

Which unit should the slab depth use?

Keep every dimension in the units shown by the selected mode. Length × width × depth gives volume only after the dimensions are compatible. A 3 × 2 m slab 0.1 m deep is 0.6 m³ before allowance; entering 10 as metres would be a major error.

Can I turn concrete volume directly into a bag weight?

Use the chosen product's stated yield per bag. Bag weight alone does not establish mixed volume. The calculator's yield is an editable purchasing input, and the calculation does not design a structural slab or approve its reinforcement, ground preparation or curing method.

How does the slab-volume example work?

A rectangular slab 4 m long, 3 m wide and 0.1 m deep contains 1.2 m³ before allowance: multiply the three dimensions in metres. An entered allowance changes the order volume separately. This quantity calculation does not establish reinforcement, structural suitability or a concrete mix; use the project's specifications.

Calculation/content reviewed 4 October 2026. Source: Babushka Market’s displayed formulas, units and labelled editable assumptions. How the estimates work

Share this tool

Embed this

Add this free interactive tool to your website.